It’s a pipe inside a pipe..inside insulation! This project took place at Colorado State University’s Rockwell Hall. (Sorry for any inconvenience, CSU students.)
Perma-pipe is a pipe-in-pipe containment system for environmental control of both hazardous and non-hazardous fluids and other materials. This particular project required precise measurements for offsets and elevation changes for 150 yards from the tie-in point to the new building.
Yes, it’s all in the details.